Home > Streets and transportation > Driving and traffic > Road closures and construction > Burrard Street Corridor Project
Rendering of Burrard Street bridge view from Pacific Street with cars, cyclists, and pedestrians

Burrard Street Corridor Project

We are upgrading critical water, sewer, and transportation safety infrastructure on Burrard Street between Davie Street and 17th Avenue from February 2016 to late 2017.

What we're upgrading

The upgrade will:

  1. Improve safety at the Burrard-Pacific intersection, the second-highest collision location in Vancouver
  2. Improve connections to enable people to walk on both sides of the bridge
  3. Replace aging infrastructure like sewer and water utilities, and roads and sidewalks
  4. Combine routine maintenance to minimize the overall impact to communities

We will make every effort to reduce traffic impacts and minimize the construction period.

Three sections

The upgrade has three sections:

  1. Burrard Bridge and the Burrard-Pacific intersection
  2. Burrard Street, from Davie Street to Pacific Street
  3. Burrard Street, from Cornwall Avenue to 17th Avenue

Learn about each section of work

Burrard Bridge and Pacific Street intersection

Rehabilitating the bridge, and improving safety and connections for people using the bridge from the intersection. Project duration: January 2016 to mid-2017.

Davie Street to Pacific Street

Replacing the water main, installing a separated sewer main, and repaving the road surface. Project duration: January 2016 to late 2016.

Cornwall to 17th Avenue

Replacing the water main and sidewalk, installing a separated sewer main, and repaving the road. View traffic changes during construction. Project duration: February 2016 to late 2017.

Find out what's happened so far

Burrard Bridge

Sidewalk work underway to return pedestrians to east side of Burrard Bridge

July 21 2017 - Starting Monday, July 24, City crews will return to the Burrard Street and Cornwall intersection to make curb adjustments as part of returning access to the east side of the bridge for people walking.

Burrard Bridge

Traffic advisory: Burrard-Pacific intersection closed this weekend

June 10 2016 - The Burrard-Pacific intersection will be closed for asphalt removal and repaving from 7:00am Saturday, June 11 to 8:00pm Sunday, June 12.

Past updates

Get project updates

Please confirm your subscription

Click the link in the email we just sent you.

Contact the project team

Community Liaison
Do Nguyen

  604-673-8458

  burrardstreet@vancouver.ca

Burrard Bridge and Pacific Street intersectionCornwall to 17th AvenueDavie Street to Pacific StreetPast updates